01 / Overview

A wall is a quiet argument with gravity. We try to win every line.

01

What it is

A retaining wall is structural before it is decorative. We engineer for the soil behind it, not just the look of the stone in front. Drainage, geo-grid reinforcement, and base preparation are non-negotiable on every build over 24 inches.

02

How we approach it

We'd rather over-engineer a 36-inch wall than have to come back and rebuild a 30-inch one. Earth pressure doesn't negotiate.

02 / Options

Patterns & variations

Allan Block Classic
P/01

Allan Block Classic

Mortarless, dry-stacked. Modular blocks engineered for grade.

Natural Limestone Veneer
P/02

Natural Limestone Veneer

Stacked over a concrete core. Reads as solid stone.

Armour Stone
P/03

Armour Stone

Hand-placed monoliths. Sculptural and structural at once.

Tiered Terraces
P/04

Tiered Terraces

Two or three short walls instead of one tall one. Better drainage, softer presence.

03 / Materials Library

What we work with — and where it comes from.

  • M.01USA / Canada

    Allan Block AB Stones

    Engineered SRW units. Charcoal, sandstone, terracotta.

  • M.02Wiarton, Ontario

    Wiarton Limestone

    Local. Warm beige with grey veining.

  • M.03Bedford, Indiana

    Indiana Limestone

    Tight grain. Cuts clean for capping.

  • M.04Various

    Geo-Grid Reinforcement

    Polymer grid tied back into compacted fill.

  • M.05Ontario

    Drainage Aggregate

    Clear ¾-inch stone behind the wall, never sand.

04 / Method

How a walls actually gets built.

  1. 01

    Survey + engineering

    Anything over 1.0 m requires a stamped engineered drawing in Ontario. We arrange that.

  2. 02

    Excavate footing

    Down to undisturbed soil. Width = wall height ÷ 2 + 12 inches.

  3. 03

    Compact base

    6 inches of crushed stone, vibratory plate compacted.

  4. 04

    First course level

    The most important course in the entire wall. Buried 10–15% of total height.

  5. 05

    Backfill + drainage

    Drain rock behind every course, grid layers per spec, fabric over the top.

  6. 06

    Cap and seal

    Capstones glued with structural adhesive. Drainage tile tied to daylight.

05 / On Site

The build, day by day.

String lines walk the curve before we dig.
Day 01Layout
String lines walk the curve before we dig.
Excavated to undisturbed soil.
Day 02Footing trench
Excavated to undisturbed soil.
Each block leveled in two directions.
Day 03First course
Each block leveled in two directions.
Drain rock placed and compacted in lifts.
Day 04Backfill
Drain rock placed and compacted in lifts.
Caps cut and glued. Wall closes out.
Day 05Capping
Caps cut and glued. Wall closes out.
06 / Investment

Starting at

$180$320/ linear ft

Most residential walls land $8K–$45K depending on height and access.

  • Lead time

    6–10 weeks (engineering included)

  • Duration

    4–10 working days

  • Scale

    20 – 200 linear ft

  • Warranty

    10 years on structure

08 / Questions

Asked every week.

  • Yes for any wall over 1.0 m (about 3.3 ft) in most GTA municipalities. We handle the application.