Anissa·Inc.
Interlocking Pavers — Driveways, walkways, courtyards.
Services / hardscape / Pavers

— Service 01 / 07

InterlockingPavers

Driveways, walkways, courtyards.600 – 1,600 sq ft

  • Category

    hardscape

  • Typical scale

    600 – 1,600 sq ft

  • Duration

    5–8 working days

  • Lead time

    4–6 weeks from deposit

01 / Overview

Quiet patterns, precise borders, joints you can read with your eye.

01

What it is

Stone laid with restraint. A driveway is the first thing a house says about itself — so we approach every paver project as a piece of architecture, not a surface. Pattern, border, transition and joint are all decided on paper before a single stone is cut.

02

How we approach it

Most paver failures aren't a paver problem — they're a base problem. We over-build the foundation so the surface looks the way it does on day one for the next twenty years.

02 / Options

Patterns & variations

Herringbone — 45°
P/01

Herringbone — 45°

The strongest interlock. Our default for driveways under load.

Running Bond
P/02

Running Bond

A calmer rhythm. Reads best on walkways and courtyard fields.

Soldier-Course Border
P/03

Soldier-Course Border

A precise charcoal frame that makes everything inside look intentional.

Fan / Circle
P/04

Fan / Circle

A centerpiece detail. Hand-cut on site, no two arcs identical.

03 / Materials Library

What we work with — and where it comes from.

  • M.01Quebec, Canada

    Techo-Bloc Blu 60mm

    Driveway-rated. Charcoal, beige, smoke.

  • M.02Ontario, Canada

    Unilock Beacon Hill

    Tumbled finish. Reads as classic.

  • M.03Quebec, Canada

    Permacon Mondrian

    Linear plank format. Modern field.

  • M.04Imported, India

    Granite Cobble Border

    Hand-split. Charcoal soldier course.

  • M.05Various

    Polymeric Sand

    Locks joints, resists ants and weeds.

04 / Method

How a pavers actually gets built.

  1. 01

    Excavate to depth

    10–14 inches removed below grade. Geo-textile separator laid first.

  2. 02

    Build a base that lasts

    Crushed Granular A in 2-inch lifts, compacted to 95% Proctor between each pass.

  3. 03

    Edge restraint

    Concrete haunch or steel edging set against compacted screenings — no movement, ever.

  4. 04

    Set the field

    Pattern laid from the most-visible edge inward. Cuts hidden against borders.

  5. 05

    Compact, sand, seal

    Vibratory compaction, polymeric joint sand, then optional sealer at the 30-day mark.

05 / On Site

The build, day by day.

Removing 12 inches. Crisp vertical walls.
Day 01Excavation
Removing 12 inches. Crisp vertical walls.
2-inch lifts. Density tested every pass.
Day 02Base compaction
2-inch lifts. Density tested every pass.
String line set. Pattern starts square.
Day 03First course
String line set. Pattern starts square.
Corner details cut with a wet saw.
Day 04Cutting
Corner details cut with a wet saw.
Joints filled, then misted to activate.
Day 05Polymeric sand
Joints filled, then misted to activate.
Surface cleaned. Driveway opens.
Day 06Final wash
Surface cleaned. Driveway opens.
06 / Investment

Starting at

$28$45/ sq ft

Most driveways land $22K–$48K all-in.

  • Lead time

    4–6 weeks from deposit

  • Duration

    5–8 working days

  • Scale

    600 – 1,600 sq ft

  • Warranty

    10 years on workmanship

08 / Questions

Asked every week.

  • Most residential driveways take 5–8 working days from excavation to final wash. Weather extends that.