Anissa·Inc.
Fencing & Decking — Cedar, composite, aluminum.
Services / structure / Fencing & Decking

— Service 05 / 07

Fencing &Decking

Cedar, composite, aluminum.40 – 300 linear ft

  • Category

    structure

  • Typical scale

    40 – 300 linear ft

  • Duration

    3–7 working days

  • Lead time

    3–5 weeks

01 / Overview

Horizontal cedar at a six-foot eye line — quiet, modern, neighborly.

01

What it is

Vertical lines and floors made of wood. Fences and decks are where carpentry meets the same engineering rigor we bring to hardscape. Posts are set in concrete, frames are over-built, and finishes are spec'd for Ontario winters.

02

How we approach it

A fence is one of the few things on a property that touches both sides of a relationship. We build them to look as honest from your neighbor's yard as from yours.

02 / Options

Patterns & variations

Horizontal Cedar
P/01

Horizontal Cedar

1×6 western red cedar slats with a 1/4-inch reveal.

Vertical Board-and-Batten
P/02

Vertical Board-and-Batten

A more traditional read. Works on classic homes.

Aluminum Picket
P/03

Aluminum Picket

Powder-coated black. Pool-code compliant.

Composite Decking
P/04

Composite Decking

Trex, TimberTech. No splinters, no annual stain.

03 / Materials Library

What we work with — and where it comes from.

  • M.01British Columbia

    Western Red Cedar

    Knot-free, kiln-dried. The standard.

  • M.02South America

    Ipe Hardwood

    Decades of life. Premium pricing.

  • M.03USA

    Trex Transcend

    Composite deck board. 25-year warranty.

  • M.04Ontario

    Aluminum Picket

    Powder-coated black. Pool-code.

  • M.05Canada

    Pressure-Treated 6×6 Posts

    Buried 4 ft in concrete.

04 / Method

How a fencing & decking actually gets built.

  1. 01

    Locate property lines

    Survey pegs verified before any post hole.

  2. 02

    Post holes

    Augered 4 ft deep, below frost line. 12-inch diameter sonotubes.

  3. 03

    Set posts in concrete

    Posts plumbed in two directions, set with high-PSI concrete.

  4. 04

    Frame

    Top and bottom rails attached. Square checked across the run.

  5. 05

    Cladding

    Slats fastened with stainless screws, hidden where possible.

  6. 06

    Gates

    Sag-free welded hardware on every gate over 4 ft wide.

05 / On Site

The build, day by day.

Property pins located. Lines strung.
Day 01Layout
Property pins located. Lines strung.
Augered 4 ft deep, below frost.
Day 02Post holes
Augered 4 ft deep, below frost.
Concrete cures 24–48 hours.
Day 03Posts set
Concrete cures 24–48 hours.
Cedar slats fastened in sequence.
Day 04Cladding
Cedar slats fastened in sequence.
Hardware tuned. Stain optional.
Day 05Gates + finish
Hardware tuned. Stain optional.
06 / Investment

Starting at

$85$145/ linear ft

Standard 6-ft horizontal cedar runs about $95/lf.

  • Lead time

    3–5 weeks

  • Duration

    3–7 working days

  • Scale

    40 – 300 linear ft

  • Warranty

    5 years on structure

08 / Questions

Asked every week.

  • Anything over 6.5 ft requires a permit in Markham; pool fences have their own code. We handle either.

Browse the full catalogue.

All services